ARDEN-ARCADE, Calif. — A half-mile stretch of Arden Way between Morse Avenue and Watt Avenue now features significant bicycle and pedestrian improvements, but motorists should still check construction restrictions before traveling through the corridor.
What changed on Arden Way
The Sacramento County Department of Transportation describes the first phase of its Complete Streets project as including protected Class IV bike lanes, separated pedestrian walkways, landscape buffers, upgraded crossings and curb ramps, improved bus stops and traffic-signal features.
Reporting in September 2026 described new raised bicycle space and distinctive trapezoidal delineators marking the boundary between walking and cycling areas. These treatments aim to make the corridor less dependent on automobile travel while giving users clearer spaces.
Are lane closures over?
The county’s Road & Lane Closures page continues to list Arden Way from Watt to Morse with daytime impacts, generally 8 a.m.–4 p.m., and a posted end date of December 31, 2026. The project’s master list also identifies Phase 1 as completed. Those records describe different aspects of the work: completion of the main street improvements does not necessarily mean every temporary restriction has been removed from the county’s live traffic list.
The county names Alta Arden Expressway and Hurley Way as possible alternate routes when closures affect traffic. Follow posted signs and work-zone personnel rather than assuming a normal lane configuration.
What happens next
The broader corridor plan contemplates later changes farther west toward Howe Avenue. Future work requires its own design, funding and construction timetable. Residents should not assume a second phase is already under construction.
Sources: SacDOT project description; SacDOT lane closures; KCRA, September 25, 2026. Information reviewed October 31, 2026. No third-party photographs reproduced.
Help this community newspaper grow
Your support helps build coverage for the people and places this local newspaper serves.
Donate once by card ↗Support Arden-Arcade News
Choose how to support Arden-Arcade News:
Credit / Debit Card via StripeChoose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Arden-Arcade News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Arden-Arcade News
- Sacramento County Evacuation Map Shows Routes and Boundaries for Southwest Arden-Arcade →
- Former Arden-Arcade Macy’s Storage and Housing Proposal Remains Pending in County Planning Records →
- Sacramento County Completes $160 Million Arden Water Pipe and Meter Upgrade After Ten Years →
- Arden-Arcade’s emPOWERment Park Opens Inclusive Playground at Bell Street and Irma Way →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.